实用新型抗震支架冷弯成型设备生产厂商-潍坊奥腾冷弯机械有限公司。公司自1998年开始从事冷弯成型设备的研发、制造。2003年正式挂牌营业,目前公司拥有**工程师8名,专业工程师10名,强大的技术团队通过不断的研发、创新,目前已经为多个行业解决了型材加工成本高的难题。为适应市场需求,公司凭借丰富的设计经验目前研发的抗震支架设备已经达到成熟应用的状态。The utility model seismic support roll forming equipment manufacturers - Weifang aoteng Cold Bending Machinery Co. Ltd.. The company began to develop in cold forming equipment since 1998, making.2003 officially open, the company currently has 8 senior engineers, 10 professional engineers, strong technical team through continuous research and development, and currently has more than hearing, an industry to solve the problem of high cost profile processing. In order to meet the market demand, the company with rich experience in the design of seismic support equipment at present research has reached the mature application state.抗震支架冷弯成型设备工艺流程:上料—板料校平—冲孔—冷弯成型—型材校直—测孔定尺—自动切断—卸料。性能特点:跟踪切断,实现不停机连续出料,采用牌坊式架构,机组运行更加稳定,自动化程度高,奥腾冷弯机械,抗震支架加工设备
,潍坊奥腾冷弯机械有限公司,降低人工运营成本;整线PLC控制,变频调廴速,各运动部件协调一致,实现效率**化;操作人员仅需1-2人接料即可;Technological process of cold forming equipment for anti-seismic support:Feeding - plate leveling punching cold forming - profile straightening - hole sizing - automatic cutting - unloadingPerformance characteristics:Tracking cut, realize non continuous discharge, the arch structure, operation of unit is more stable, high degree of automation, reduce operating costs; control the whole line, PLC frequency control, all moving parts coordinated to maximize efficiency; the operator is only 1-2 people can meet the material; 抗震支架成型设备机身部分是本轧机的主体,奥腾冷弯机械,抗震支架加工设备
,潍坊奥腾冷弯机械有限公司,其余组成部分均装在本机身上,为钢焊接结构,均采用方管和钢板焊接而成,焊接完成后均去应力处理。各连接面、安装面精加工且安装面加工有定位键槽,定位精确,安装饣方便,保证各组轧机主轴之间的平行度及 与轧制中心线的垂直度。牌坊组件是本机的主要工作部分,共有20架,自前至后依次安装固定在机身上。本组件主要由前后牌坊架、上下主轴、上横梁、上轴升降调节丝杆、前后轴承支座及主轴轴承等组成。后牌坊架固定在机身上,是上下主轴的支持基准;前牌坊可拆卸,方便更换装配轧辊。上下主轴通过轴承安装在轴承支座上,轴承支座可沿牌坊窗口的导向面通过调节丝杆带动调节上下轴间的距离以适用不同直径轧辊的安装。上下主轴是ф85mm的40Cr圆钢加工而成。Seismic frame molding equipment is the main body part of the mill, the other part are installed in the machine body, steel welded structure, adopts square tube and welded steel plate after welding are stress. The connecting surface mounting surface finishing and mounting surface processing positioning keyway, accurate positioning between the groups, convenient installation, parallelism and spindle mill and the rolling centre line to ensure the verticality.The arch component is the main work of the machine part, a total of 20 frame, from front to back in turn mounted on the fuselage. This component is composed of front and rear frame, on the spindle, the upper beam, on the shaft of the lifting adjusting screw rod, and bearing and spindle bearings and other components. After the frame is fixed on the machine that is on the spindle support base; before the arch removable, convenie
.奥腾冷弯机械///抗震支架加工设备 |