在施工过程中如何保证耐磨地坪的质量呢?下面由于贵阳金刚砂耐磨地坪为您介绍:
1、确保耐磨料与水泥混凝土底层的优越粘结及地坪的颜色一致,首要是节制耐磨料的撒布机每平米的撒布量,撒布应选择在混凝土初凝阶段,每平米的撒布量应经过两次撒布以到达撒布平均,撒布量在6-8kg/m2.
2、避免金刚砂耐磨地坪发生缩短裂痕首要是注意两个方面:
一是撒布耐磨料前节制好混凝土外表的枯燥度,如混凝土外表有积水,须清算洁净再进行撒布,不然积水部位轻易呈现干缩裂痕。
3、严厉节制地坪外表平坦度:
地坪施工的平坦度首要靠水泥混凝土底层的平坦度来节制,耐磨料仅是外表很薄的一道致密层,所以节制混凝土初凝前外表的平坦度是要害工序.建议严厉节制水泥混凝土浇注时的平坦度,可采用一前一后两次刮杠找平.别的,在两条混凝土相邻的施工缝处,因为接近施工缝模板处施工过程中如何保证耐磨地坪的质量呢?下面由于贵阳金刚砂耐磨地坪为您介绍:
1、确保耐磨料与水泥混凝土底层的优越粘结及地坪的颜色一致,首要是节制耐磨料的撒布机每平米的撒布量,撒布应选择在混凝土初凝阶段,每平米的撒布量应经过两次撒布以到达撒布平均,撒布量在6-8kg/m2.
2、避免金刚砂耐磨地坪发生缩短裂痕首要是注意两个方面:
一是撒布耐磨料前节制好混凝土外表的枯燥度,如混凝土外表有积水,须清算洁净再进行撒布,不然积水部位轻易呈现干缩裂痕。
3、严厉节制地坪外表平坦度:
地坪施工的平坦度首要靠水泥混凝土底层的平坦度来节制,耐磨料仅是外表很薄的一道致密层,所以节制混凝土初凝前外表的平坦度是要害工序.建议严厉节制水泥混凝土浇注时的平坦度,可采用一前一后两次刮杠找平.别的,在两条混凝土相邻的施工缝处,因为接近施工缝模板处,在地坪收光成型时抹光机不易打磨到,所以在施工缝处轻易惹起高差.因而,在模板撤除后应进行施工缝清算任务.其办法是用切割机沿施工缝弹线切割失落50mm宽、深50mm左右的混凝土,并在二次浇注混凝土前剔凿失落,以此确保二次浇筑的混凝土与已浇筑完成的混凝土接槎平直,留意弹线、切割应顺直。
How in the construction process to ensure the wear-resistant floor of quality? Because of Guiyang below carborundum wearable Floor introduce you to:
1, to ensure consistent and excellent adhesion wear material and the underlying concrete floor color, first and foremost is moderation Abrasive spreader spreading amount per square meter, spreading should be selected in the initial setting of the concrete stage, spreading amount per square meter After two to be spreading to Da Sabu average, spreading the amount of 6-8kg / m2.
2, to avoid the occurrence of shortening carborundum wearable Floor cracks first and foremost pay attention to two aspects:
First, wear-resistant material control before spreading dull concrete of good appearance, such as the appearance of a concrete water shall be clean then spreading liquidation, or parts prone to shrinkage cracks water.
3, strictly control the appearance of the floor flatness:
The flatness of the floor construction of the first to rely on the underlying concrete flatness to control, wear very thin material is only the outer layer of a dense, so flatness control before the appearance of the initial setting of concrete is the key step is recommended strict control of cement concrete pouring When flatness, can be used after a previous two scratch leveling bar. In addition, in two adjacent concrete construction joints, construction joints because of construction near the template at how to ensure wear-resistant floor of quality? Because of Guiyang below carborundum wearable Floor introduce you to:
1, to ensure consistent and excellent adhesion wear material and the underlying concrete floor color, first and foremost is moderation Abrasive spreader spreading amount per square meter, spreading should be selected in the initial setting of the concrete stage, spreading amount per square meter After two to be spreading to Da Sabu average, spreading the amount of 6-8kg / m2.
2, to avoid the occurrence of shortening carborundum wearable Floor cracks first and foremost pay attention to two aspects:
First, wear-resistant material control before spreading dull concrete of good appearance, such as the appearance of a concrete water shall be clean then spreading liquidation, or parts prone to shrinkage cracks water.
3, strictly control the appearance of the floor flatness:
The flatness of the floor construction of the first to rely on the underlying concrete flatness to control, wear very thin material is only the outer layer of a dense, so flatness control before the appearance of the initial setting of concrete is the key step is recommended strict control of cement concrete pouring When flatness, can be used after a previous two scratch leveling bar. In addition, in two adjacent concrete construction joints, construction joints because nearly template at the ground floor closed when light forming trowel easy polish to, so the construction joints easily aroused elevation. Thus, after the removal of the template construction joints liquidation tasks should be carried out. Its approach is to cut the loss by cutting along the 50mm wide elastic line construction joints, concrete around 50mm deep, and in the second before pouring concrete tick chisel lost times, in order to ensure the secondary cast concrete has been poured and finished concrete access Cha straight, pay attention to playing the line, cut should be straight.